PROJECT SCHEDULE AND PERFORMANCE OF ROAD CONSTRUCTION PROJECTS AT THE KENYA NATIONAL HIGHWAYS AUTHORITY
Abstract
In Kenya the number of construction projects is increasing radically. However, majority of these Projects are not completed within allocated cost and time. Controlling cost of road construction has become one of the major challenges in Kenya Construction Industry. The main objective of this study was to determine the influence of project schedule on performance of road construction projects at the Kenya National Highways Authority. The study adopted descriptive research with a study population of 200 roads construction project done at KeNHA. Who have been involved in the supervision of large road construction projects within KeNHA completed between the years 2000 to 2020? The study employed purposive sampling design by using a to select a sample size of 134 respondents. The main data collection instrument was questionnaires containing both open and close ended questions. Descriptive statistics data analysis method was applied to analyze data aided by Statistical Package version 25 for Social Science (SPSS) to compute response frequencies, mean, standard deviation and covariance. Finally linear regression model was used to establish the significance of the independent variables on the dependent variable. The study findings indicated that project schedule accounts for 22.5% of changes in performance of road construction projects when other factors are held constant. The study concluded that project schedule influence performance of road construction projects in KeNHA significantly. The study recommends that Projects managers in construction companies embrace effective contract planning methods.
Key Words: project cost management, project schedule, performance of road construction projects
Full Text:
PDFReferences
Adam, A., Josephson, P. E. B., & Lindahl, G. (2017). Aggregation of factors causing cost fluctuation and time delays in large public construction projects: trends and implications. Engineering, construction and architectural management, 24(3), 393-406.
Adam, A., Josephson, P. E., & Lindahl, G. (2015). Implications of cost fluctuation and time delays on major public construction projects. In Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate (pp. 747-758). Springer, Berlin, Heidelberg.
Agyeman, S., Asare, E. K., & Ankomah, E. N. (2016). The effects of Design Information on reliability of progress and cost estimates of construction projects: The case of two Civil Engineering projects. American Journal of Civil Engineering, 4(6), 326-336.
Ahiaga-Dagbui, D. D., & Smith, S. D. (2014). Rethinking construction cost fluctuation: cognition, learning and estimation. Journal of Financial Management of Property and Construction, 19(1), 38-54.
Aliakbarlou, S., Wilkinson, S., Costello, S. B., & Jang, H. (2017). Achieving post disaster reconstruction success based on satisfactory delivery of client values within contractors’ services. Journal of Management in Engineering, 34(2), 04017058.
Aljohani, A., Ahiaga-Dagbui, D., & Moore, D. (2017). Construction Projects Cost fluctuation: What Does the Literature Tell Us? International Journal of Innovation, Management and Technology, 8(2), 137.
Arditi, D., Nayak, S., & Damci, A. (2017). Effect of organizational culture on delay in construction. International Journal of Project Management, 35(2), 136-147.
Bert, W. & Tukel, O.I. (2012). A new framework for determining critical success/failure factors in projects. International Journal of Project Management 14(3), pp. 141-151.
Boru, A. (2016). Determinants of Cost fluctuation in Kenya’s Public Sector Construction Projects: A Case of Meru County, Kenya. International Journal of Business and Social Sciences, 3(4), 25-33.
Cantarelli, C. C., Flybjerg, B., Molin, E. J., & Van Wee, B. (2013). Cost fluctuation in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness. arXiv preprint arXiv:1307.2176.
Cardoso, P., Dominguez, C., & Paiva, A. (2015). Hints to improve motivation in construction companies. Procedia Computer Science, 64, 1200-1207.
Cheng, Y. M. (2014). An exploration into cost-influencing factors on construction projects. International Journal of Project Management, 32(5), 850-860.
Choge, J. K., & Muturi, W. M. (2014). Factors affecting adherence to cost estimates: A survey of construction projects of Kenya National Highways Authority. International Journal of Social Sciences and Entrepreneurship, 1(11), 689-705.
Creswell, J. W. & Creswell, J. D. (2017). Research design: Qualitative, quantitative, and mixed methods approaches. Sage publications.
Dwork, C., Feldman, V., Hardt, M., Pitassi, T., Reingold, O., & Roth, A. L. (2015, June). Preserving statistical validity in adaptive data analysis. In Proceedings of the forty-seventh annual ACM symposium on Theory of computing (pp. 117-126). ACM
Gardezi, S. S. S., Manarvi, I. A., & Gardezi, S. J. S. (2014). Time extension factors in construction industry of Pakistan. Procedia Engineering, 77, 196-204.
Gituro, W., & Mwawasi, S. (2017). Time and Cost Fluctuation in Road Construction Projects in Kenya Under Kenya National Highways Authority. ORSEA JOURNAL, 6(1).
Gorard, S. (2013). Research design: Creating robust approaches for the social sciences. Sage.
Grathwohl, M. (2018). World Energy Supply: Resources-Technologies-Perspectives. Walter de Gruyter GmbH & Co KG.
Hair Jr, Joseph F., and Bryan Lukas. Marketing research. Vol. 2. McGraw-Hill Education Australia, 2014.
Hammalund, B.-G. & Lim, E.S.J. (2012). Critical Success Factors for Key Project Players and Objectives: Case Study of Singapore. Journal of Construction Engineering and Management 1(1), pp. 446-446.
Ismail, I. (2014). Risk assessment of time and cost fluctuation factors throughout construction project lifecycle (Doctoral dissertation, University Tun Hussein Onn Malaysia).
Jomo, K. S. (2016). Growth and structural change in the Malaysian economy. Springer.
Kerzner, H. (2015). Project management 2.0: leveraging tools, distributed collaboration, and metrics for project success. John Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Kithinji, E. (2016). The Importance of Standard Gauge Railway (SGR) Project.
Kwatsima, S. A. (2017). An Investigation into the Causes of Delay in Large Construction Projects in Kenya (Doctoral dissertation, COETEC, JKUAT).
Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2015). Factors affecting schedule delay, cost fluctuation, and quality level in public construction projects. Journal of Management in Engineering, 32(1), 04015032.
Lewis, S. (2015). Qualitative inquiry and research design: Choosing among five approaches. Health promotion practice, 16(4), 473-475.
Love, P. E., Smith, J., Simpson, I., Regan, M., & Olatunji, O. (2015). Understanding the landscape of fluctuation in transport infrastructure projects. Environment and Planning B: Planning and Design, 42(3), 490-509.
Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of advanced research, 5(1), 49-55.
Mbaluku, W., & Bwisa, R. (2013). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206
Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. (2014). Factors affecting construction cost performance in project management projects: Case of MARA large projects. International Journal of Civil Engineering and Built Environment, 1(1).
Meyers, L. S., Gamst, G., & Guarino, A. J. (2016). Applied multivariate research: Design and interpretation. Sage publications.
Murimi, M. J. (2016). Influence of leadership styles on timely completion of road construction projects in Kenya: a case of Norken ltd, Nairobi, Kenya (Doctoral dissertation, Master’s Thesis). University of Nairobi, Nairobi, Kenya).
Mwawasi, S. W. (2015). Time And Cost Fluctuation in Road Construction Projects in Kenya Under Kenya National Highways Authority.
Ndunge D. Kyalo; Nyonje Raphael; Itegi Muthoni (2011), Project Planning and Management - Project Planning, Design and Implementation: Notes for Beginners; VDM Verlag Dr. Muller No. ISBN-13: 978-3-639-33782-2
Nyandika, O. F., & Ngugi, K. (2014). Influence of Stakeholders' Participation on Performance of Road Projects at Kenya National Highways Authority. European Journal of Business Management, 1(11), 384-404.
Odeck, J. (2014). Cost fluctuation in road construction—what are their sizes and determinants? Transport policy, 11(1), 43-53.
Ogutu, S. O. (2017). Extent of adoption of best human resource management practices in private secondary schools in Kisumu East Sub-County, Kenya (Doctoral dissertation, School of Business, University of Nairobi).
Rahman, K.-W. (2013). The Critical Success Factors for Project in Dynamic Environments.
Ramanathan, C. (2012) Construction delays causing risks on time and cost. Australian Journal of construction Economics and Building.
Shah, R. K. (2016). An Exploration of Causes for Cost fluctuation In Construction Projects: Case Study of Australia, Malaysia & Ghana. Journal of Advanced College of Engineering and Management, 2, 41-55.
Shehu, Z., Endut, I. R., & Akintoye, A. (2014). Factors contributing to project time and hence cost fluctuation in the Malaysian construction industry. Journal of Financial Management of Property and Construction, 19(1), 55-75.
Song, S., Coit, D. W., Feng, Q. & Peng, H. (2014). Reliability analysis for multi-component systems subject to multiple dependent competing failure processes. IEEE Transactions on Reliability, 63(1), 331-345
Sovacool, B. K., Nugent, D., & Gilbert, A. (2014). Construction cost fluctuation and electricity infrastructure: an unavoidable risk? The Electricity Journal, 27(4), 112-120.
Subramani, T., Sruthi, P. S., & Kavitha, M. (2014). Causes of cost fluctuation in construction. IOSR Journal of Engineering, 4(6), 1-7.
Subramani, T., Sruthi, P. S., & Kavitha, M. (2014). Causes of cost fluctuation in construction. IOSR Journal of Engineering, 4(6), 1-7.
Tawil, N. (2013). Factors contributing to delay in construction projects in Higher Learning Education. Research Journal of Applied Sciences, Engineering and Technology.
University of Warwick
Vhumbunu, C. H. (2016). Enabling African Regional Infrastructure Renaissance through the China-Africa Partnership: A Trans-Continental Appraisal. International Journal of China Studies, 7(3), 271.
Wang, K. T. (2015). Research design in counseling. Nelson Education.
Wanjiku, S. M. (2015). Monitoring and Evaluation: Factors Influencing the Performance of Road Infrastructural Projects: A Case Study of Nyandarua County, Kenya.
Williams, T. P., & Gong, J. (2014). Predicting construction cost fluctuation using text mining, numerical data and ensemble classifiers. Automation in Construction, 43, 23-29.
Refbacks
- There are currently no refbacks.