STAKEHOLDER ENGAGEMENT AND PERFORMANCE OF HEALTH PROJECTS IN PUBLIC HOSPITALS IN NYERI COUNTY, KENYA
Abstract
This study aimed at studying the relationship between stakeholder engagement and project performance by focusing on two objectives, stakeholder analysis and stakeholder conflict management. The study was guided by two theories; stakeholder Theory and contingency theory. The study adopted a descriptive research design. The target population was the public hospitals in Nyeri County. The unit of analysis was public hospitals health projects in Nyeri county while the unit of observation was hospital management team, project implementers, and representative’s agencies from government since they are involved in the implementation of health projects in Nyeri county. The study adopted census hence no sampling was done. Data was collected using semi- structured questionnaires. After the data collected, it was subjected to editing, handling blank responses, coding categorizing and keyed into statistical package for social science computer software for analysis version 24. The study adopted descriptive statistics and inferential statistics. The data was presented using tables. Findings show that; there is a moderate significant relationship between stakeholder analysis and performance of health projects, Kenya (r = 0.370, p-value=0.000) and a strong significant relationship between stakeholder conflict management and performance of health projects, Kenya (r= 0.526, p-value= 0.040). The study recommends that; project managers should identify and document all the stakeholders in order to keep record and assess new stakeholders and project managers must seek to understand the differences of opinions among the project team and stakeholders and makes them transparent.
Key Words: Stakeholder engagement, project performance, stakeholder analysis, stakeholder conflict management
Full Text:
PDFReferences
Ashraf, H., & Rowlinson, S. (2015). The importance of context in conflict management: Explicating the notion of conflict management climate and agenda setting for future research. 31st Annual ARCOM Conference, Lincoln, UK, 1021–1030.
Baharuddin, H. E. A., Wilkinson, S., & Costello, S. B. (2013). Evaluating early stakeholder engagement (ESE) as a process for innovation. CIB World Building Congress, Brisbane, Australia.
Bal, M., Bryde, D., Fearon, D., & Ochieng, E. (2013). Stakeholder engagement: Achieving sustainability in the construction sector. Sustainability, 5(2), 695–710.
Califf, R. M., Robb, M. A., Bindman, A. B., Briggs, J. P., Collins, F. S., Conway, P. H., Coster, T. S., Cunningham, F. E., De Lew, N., & DeSalvo, K. B. (2016). Transforming evidence generation to support health and health care decisions. In New England Journal of Medicine (Vol. 375, Issue 24, pp. 2395–2400). Mass Medical Soc.
Freeman, R. E., & Dmytriyev, S. (2017). Corporate social responsibility and stakeholder theory: Learning from each other. Symphonya. Emerging Issues in Management, 1, 7–15.
Hatipoglu, B., Alvarez, M. D., & Ertuna, B. (2016). Barriers to stakeholder involvement in the planning of sustainable tourism: The case of the Thrace region in Turkey. Journal of Cleaner Production, 111, 306–317.
Heravi, A., Coffey, V., & Trigunarsyah, B. (2015). Evaluating the level of stakeholder involvement during the project planning processes of building projects. International Journal of Project anagement, 33(5), 985–997.
Kelbessa, D. (2016). The role of project stakeholder management on performance of public projects in Ethiopia. Addis Ababa University.
Kobusingye, B., Mungatu, J. K., & Mulyungi, P. (2017). Influence of stakeholders involvement on project outcomes. A case of water, sanitation, and hygiene (wash) project in Rwanda. European Journal of Business and Social Sciences, 6(6), 195–206.
Lalam, E. Y. (2018). Stakeholder Engagement, Community Participation, Stakeholder Commitment and Project Sustainability.
Liu, J., Platts-Mills, J. A., Juma, J., Kabir, F., Nkeze, J., Okoi, C., Operario, D. J., Uddin, J., Ahmed, S., & Alonso, P. L. (2016). Use of quantitative molecular diagnostic methods to identify causes of diarrhoea in children: A reanalysis of the GEMS case-control study. The Lancet, 388(10051), 1291–1301.
Machange, S. W. (2019). The role of communication on performance of donor funded agricultural project: A case of research, community and organizational development associates. Sokoine University of Agriculture.
Magassouba, S. M., Tambi, A. M. B. A., Alkhlaifat, B., & Abdullah, A. A. (2019). Influence of stakeholders involvement on development project performance in Guinea. International Journal of Academic Research in Business and Social Sciences, 9(1), 1111–1120.
Maina, S. M., & Kimutai, M. G. (2018). Stakeholder Management and Project Performance of Open Air Market Projects in Nyeri County, Kenya. Kenyatta University, Kenya.
Mambwe, M., Mwanaumo, E. M., Nsefu, M. K., & Sakala, N. (2020). Impact of Stakeholder Engagement on Performance of Construction Projects in Lusaka District. African International Conference on Industrial Engineering and Operations Management, 2(1), 86–107.
Maringa, P. G. (2018). Factors influencing sustainability of children homes programmes managed by Non-Governmental Organizations in Kenya; a case of Mbeere South; Embu County. University of Nairobi.
Muchemi, D. M. (2017). Determinants Of Conflict Management In Organizations With Matrix Organization Structure. University of Nairobi.
Murwanashyaka, T., & Shukla, J. (n.d.). Effect of Stakeholders Management Practices on Performance of Construction Projects in Rwanda.
Muszyńska, K. (2016). Towards project communication management patterns. Studia Informatica Pomerania.
Njogu, E. M. (2016). Influence of stakeholders involvement on project performance: A case of NEMA automobile emmission control project in Nairobi County, Kenya. University of Nairobi.
Nkumbe, R. (2019). Overcoming the Challenges of Rural Electrification through Stakeholders’ Participation in Policy Making: Case of Cameroon. PAUWES.
Shahatit, M. M. I. (2016). A study on effective communication for effective delivery of programme in construction industry.
Sudhakar, G. (2015). A review of conflict management techniques in projects. Brazilian Journal of Operations & Production Management, 12(2), 214–232.
Waithera, N. J. (2019). Influence of Stakeholder Participation on Domestic Waste Management in Biashara Residential Area, Kiambu County, Kenya. Kenyatta University.
Wandabwa, K. J., & Yusuf, M. (2018). Effect of stakeholders’ management on health project performance for national hospital insurance fund Kenya. International Journal of Business Management and Finance, 2(1).
Wu, P.-H., Aroush, D. R.-B., Asnacios, A., Chen, W.-C., Dokukin, M. E., Doss, B. L., Durand-Smet, P., Ekpenyong, A., Guck, J., & Guz, N. V. (2018). A comparison of methods to assess cell mechanical properties. Nature Methods, 15(7), 491–498.
Zuofa, T. (2014). Project failure: The way forward and panacea for development. International Journal of Business and Management, 9(11).
Refbacks
- There are currently no refbacks.