PROJECT PLANNING PRACTICES AND PERFORMANCE OF PUBLIC-PRIVATE-PARTNERSHIP PROJECTS IN KENYA ENERGY SECTOR
Abstract
According to a report from the World Bank Group, PPP usage has surged across the globe and is currently implemented in over 134 developing nations, accounting for approximately 15-20% of overall infrastructure investment. Kenya is also facing subdued economic growth due to infrastructural constraints, with an overall infrastructure need estimated at approximately USD 59.176 billion. Energy and transport are the two infrastructure constraints that weigh most heavily on Kenyan firms. The Kenya Vision 2030 recognizes energy, among other sectors, as a key enabler for sustained economic growth, development, and poverty reduction. To fully finance the total infrastructure needs for the energy sector, which stands at 19.8 billion or 34% of the infrastructure budget, the government of Kenya has initiated and developed several power projects in Kenya through PPP under Build-Operate-Transfer (BOT) with the aim of achieving the ambitious target of universal access to electricity by 2030. Since there is limited research work carried out in Kenya on BOT projects, this research study aimed to fill this gap by assessing the impact of Project Planning practices on the performance of Public-Private Partnership (PPP) projects in the Kenyan energy sector. By addressing this objective, the research provided insights into the effectiveness of Project Planning practices in enhancing the performance and success of PPP projects in the energy sector of Kenya. The study employed a descriptive research methodology to elucidate the influence of Project Planning practices on the performance of PPP in the Kenya energy sector. The study targeted 7 major energy projects in Kenya, and 120 respondents were administered with questionnaires through census. A pilot study was conducted where 10% of the sample was used to check for validity and reliability. The study analysed descriptive and inferential statistics. Quantitative data was analysed using measure of central tendency while thematic analysis was used to analyse the qualitative data. The inferential analysis used regression analysis to establish the relationship between the independent variables and the dependent variable. The study established that the joint variables explained 54.2% of variation of project performance in the energy sector. The joint variables also had strong correlation with project performance (r =.749). Project Risk planning, and Project Cost planning had positive significant influence on performance of PPP projects in the Kenya Energy Sector. The study recommended for implementation of project plans in projects to ensure there is improved project performance. The study also recommended a similar study to ascertain the variation of project performance and also the insignificance of Regulatory framework on project performance. The findings were presented in table and figures and later discussed. The study is useful to project practitioners, policy makers, and scholars.
Key words: Project Cost Planning, Project Risk Planning, performanceFull Text:
PDFReferences
Abdel-Hamid, M., & Abdelhaleem, H. M. (2021). 'Project cost control using five dimensions building information modelling'. International Journal of Construction Management,, 1-10.
Association for Project Management. (2018). APM Body of Knowledge, (6th ed.). Association for Project Management: Buckinghamshire.
Bryman, A., & Bell, E. (2022). Business Research Methods. New York: Oxford University Press Inc.
Creswell, J. W., & Creswell, J. D. (2018). 'Research design: Qualitative, quantitative, and mixed methods approaches'. Sage publications.
Doval, E. (2019). Risk management process in projects. Review of general management, 30(2), 97-113.
Eliab, M. T., & Kisimbii, J. (2020). Determinants of Performance of Water Projects in Urban Center in Kenya: A Case of Mji Wa Kale Sub-Location in Mombasa County. Journal of Entrepreneurship and Project Management, 5(2), 23-45.
James, C. (2011). Comic Relief and Theory of Change. Comic Relief.
Jongo, J. S., Tesha, D. N., Kasonga, R., Teyanga, J. J., & Lyimo, K. S. (2019). Mitigation Measures in Dealing with Delays and Cost Overrun in Public Building Projects in Dar-Es-Salaam, Tanzania. International Journal of Construction Engineering and Management, 8(3), 81-96.
Kerzner, H. (2017). Project Management: A systems approach to planning, scheduling, and controlling (10th ed.). New Jersey: John Wiley & Sons, Inc.
Kioko, G. W., & Yusuf, M. (2023). Relationship between stakeholder management and performance of borehole water projects in Makueni county, Kenya. World journal of innovative research, 14(4), 18-25.
Konior, J., & Szóstak, M. (2020). 'Methodology of planning the course of the cumulative cost curve in construction projects'. Sustainability, 12(6), 23-47.
Kunya, I. O., & Yusuf, M. (2023). 'Risk Management Practices and Performance of Renewable Energy Projects in Nairobi County'. World Journal of Innovative Research, 14(4), 41-49. doi:https://doi.org/10.31871/WJIR.14.4.14
Mugenda, A., & Mugenda, O. (2018). Research Methods: Quantitative and Qualitative Approaches. Nairobi: ACT.
Mugenda, O., & Mugenda, A. (2018). Research Methods. Nairobi: Acts Press.
Muiruri, B., & Bett, S. (2020). 'Project Management Practices and Performance of Organizations within the Water Sector in Kenya'. International Journal of Business Management Entrepreneurship and Innovation, 2(3), 74-86.
Mukeshimana, E., Dushimimana, J. d., Mutabazi, P., & Gamariel, N. (2022). 'Effect of project planning practices on improving project performance in Rwanda. A case of Huguka Dukore akazi Kanoze Project in Nyabihu district (2017-2020)'. International Journal of Social Sciences: Current and Future Research Trends, 13(1), 88-94.
Muriuki, C. (2021). "Influence of community-based structures on sustainability of water projects: A case of borehole projects in Makueni County, Kenya". M.A. of arts thesis in project planning and management , University of Nairobi.
Muute, N. C. (2019). Project planning practices and performance of cnstruciton projects in Nairobi County Kenya. MBA theis is project mangement, Kenyatta University.
Muute, N., & James, R. (2019). 'Project planning practices and performance of construction projects in Nairobi City County, Kenya'. Kenyatta University. Unpublished Masters Dissertation.
Mwangi, L. W., & Yusuf, M. (2022). 'Project scope management and successful impementation of infrastructural helath program in Nairobi County'. International Journal of Management and Commerce Innovations, 10(1), 140-148.
Mwanza, P. W., Namusonge, G. S., & Makokha, E. N. (2020). "Influence of project planning practice on performance of construction projects in Kenya". Internationl Journal of social sciences and information technology, 5(5), 23-30.
Naeem, s., Khanzada, B., Mubashir, T., & sohail, H. (2018). 'Impact of Project Planning on Project Success with Mediating Role of Risk Management and Moderating Role of Organizational Culture'. International Journal of Business and Social Science, 9(1), 88 - 98.
Ndegwa, P. W. (2020). "Infleunce of M&E process on implementation of water, sanaitation and hygiene projects in Kenya: A case of UNICEF Programme, Kajiao County". M.A. Thesis in project planning and management, University of Nairobi.
Newing, H. (2018). 'Conducting research in conservation: Social Science methods and practice'. Routlegde.
Njuguna, P. G. (2019). Risk mangment practices and performance of projects in Nairobi city county Kenya. MBA in Project management, Kenyatta University.
O´Flynn, M., & Moberly, C. (2015). Theory of Change. Oxbridge Court, United Kingdom: INTRAC.
Ochola, L. S. (2018). 'Contract management practices and performance of housing construction projects in Nairobi County: A case of NCA'. MBA in project management, Kenyatta University.
Ogogo, D. O., Omwenga, J. Q., & Paul, S. N. (2019). 'Influence of the Moderating Effect of Government Regulations on Performance of Government Construction Projects in Kenya'. The international journal of humanities & social studies, 7(4), 78 - 81.
Ondiek, F. (2020). 'Influence Of Project Planning On Road Construction Projects Performance In UasinGishu County, Kenya'. Doctoral dissertation, JKUAT.
Pedo, M. O., Kabare, K., & Makori, M. (2017). 'Effect of regulatory framework on the performance of pupblic private partnerships roads projects in Kenya'. The Strategic Journal of Business & Change Management, 5(2), 850 - 868.
PMI. (2017). A Guide to the Project Management Body of Knowledge: PMBOK Guide (6th ed.). Newtown Square, PA: Project Management Institute, Inc.
PMI. (2017). Guide to the Project Management Body of Knowledge PMBOK Guide 6th Edition. Newtown Square: Project Management Institute, Inc.
Potts, K. (2018). Construction cost management : Learning from cases. London and New York: Taylor & Fancis group.
Serrat, O. (2017). Theories of change. Knowledge Solutions,, 237-243.
Sesti, C. (2019). Systems Theory in Project Management. Retrieved 03 2022, from apppm: http://apppm.man.dtu.dk/index.php/Systems_Theory_in_Project_Management#Systems_Theory_in_Project_Management
Simon, O. F., & Mutiso, J. (2021). Influence of project risk management on performance of agricultural projects in Nakuru County. International Research Journal Publishers, 2(2), 371-387.
Stella Inabo. (2023). The Mega guide to resource planning for project managers. Retrieved from float.com: https://www.float.com/resources/guide-to-resource-planning/#:~:text=Resource%20planning%20is%20the%20process,based%20on%20your%20team's%20capacity.
Thompson, B., & Yang, S. (2021). Interpretation of Likert-Type Response Scales. Journal of Adult Education Research, 8(1), 1-9.
Wafula, W. C., Makokha, E. N., & Namusonge, S. G. (2019). 'Effect of project planning on performance of CDF health facilities construction projects in Trans-Nzoia County Kenya'. International Journal of Recent Research in Commerce Economics and Management, 6(2), 68-84.
Wysocki, R. K. (2016). Effective project management: traditional, agile, extreme. John Wiley & Sons.