COST AND TIME SCHEDULING ON PERFORMANCE OF GEOTHERMAL DRILLING PROJECTS IN OLKARIA, NAKURU COUNTY, KENYA
Abstract
Purpose: The objectives of the study was to determine the influence of cost and time scheduling as practices of schedule management on performance of geothermal drilling projects in Olkaria, Nakuru County in Kenya.
Methodology: The study adopted descriptive survey design. The study targeted geothermal drilling projects in Olkaria, Nakuru County, Kenya. A sample of 146 respondents consisting of project managers, engineers, technicians and rig workers involved in geothermal drilling projects was identified for the purpose of this research.
Findings: The study found Cost scheduling and Time Scheduling have significant influence on performance of geothermal drilling projects. The study established that cost scheduling had a positive (β = .221), significant (sig s= .000<.05) and direct relationship with performance of geothermal drilling projects in Olkaria, Nakuru County, Kenya. Cost scheduling also influenced performance of geothermal projects to an extent of .271 (27.1%). The study found time scheduling had a positive (β = .196), significant (sig = .003<.05) and direct relationship with performance of geothermal drilling projects in Olkaria, Nakuru County, Kenya. Time scheduling also influence performance of geothermal projects to an extent of .266 (26.6%). There is a significant relationship between Time scheduling and Performance of geothermal projects in Olkaria, Nakuru County, Kenya.
Recommendations: The study recommended for adoption of effective schedule management practices in projects to ensure there is improved performance
Keywords: Cost scheduling, time schedule, performance of geothermal projects
Full Text:
PDFReferences
Archer, R. (2020). Geothermal energy. Future Energy, 431-444.
Barney, J. (1991). Firm resources and sustained competitive advantage. Journal of management, 17(1), 99-120.
Belay, S. M., Tilahun, S., Yehualaw, M., Matos, J., Sousa, H., & Workneh, E. T. (2021). 'Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia'. Advances in Civil Engineering, 1-15.
Bohra, B. u. (2023). Baseline Budget. Retrieved from projectmanagement.com/: https://www.projectmanagement.com/
Carvalho, M. M., & Rabechini, R. (2017). Can project sustainability management impact project success? An empirical study applying a contingent approach. International Journal of Project Management, 35(6), 1120-1132.
Collis, D. J., & Montgomery, C. A. (2008). comprting on resources. Harvard business review.
Fahey, T. (2005). The Case for an EU wide measure of poverty. Dublin: The Economic and Social Research Institute.
GOK. (2018). 'Least Cost Power Development Plan 2017-2037. Nairobi: Governement of Kenya.
IRENA. (2018). 'Geothermal finance and risk mitigation in East Africa'. Nairobi: International Renewable Energy Agency.
Johnson, O. W., & Ogeya, M. (2018). 'Risky business: developing geothermal power in Kenya'. Stockholm Environement Institute.
Kerzner, H. (2017). Project Management: A systems approach to planning, scheduling, and controlling (10th ed.). New Jersey: John Wiley & Sons, Inc.
Kincer, J., & Ngaryo, S. D. (2021). 5 Major Barriers to Scaling Up Geothermal in East Africa. Retrieved from https://energyforgrowth.org/: https://energyforgrowth.org/5 Major Barriers to Scaling Up Geothermal in East Africa
Makori, S., & Mundia, M. (2019). 'Influence of schdeuling techniques on project performance of registered building works contractors in Nakuru County, Kenya'. The international journal of humanities & Scoial Studies, 7(10), 331-356.
Manzella, A. (2017). 'Geothermal energy.'. EPJ Web of Conferences,, 148. Retrieved from https://doi.org/10.1051/epjconf/201714800012
Mokveld, K., & Eije, S. v. (2018). 'Final Energy report Kenya '.
Muriga, G. (2019). 'SDG Short Course IV on Exploration and Development of Geothermal Resources, SDG Short Course IV on Exploration and Development of Geothermal Resources'. Master os science thesis in Energy management, University of Nairobi, NAirobi.
Oburu, A. O. (2020). 'Effective project time management'. International Academic Journal of Information Sciences and Project Management, 3(6), 47-55.
Omulupi, P., & Yusuf, M. (2022). 'Projec time scheduling on successful implementation of healthcare projects in Nairobi County'. International Journal of Project Planning and Management, 5(2), 41-51.
Penrose, E. (2009). The theory of growth of the firm (4th ed.). Oxford University Press.
PMI. (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) (5th ed.). Newtown Square, Pennsylvania 19073-3299 USA: Project Management Institute, Inc.
Richter, A. (2023). 'ThinkGeoEnergy’s top 10 geothermal countries 2022 – power generation capacity (MW)'. Retrieved from thinkenergy.com: https://www.thinkgeoenergy.com/thinkgeoenergys-top-10-geothermal-countries-2022-power-generation-capacity-mw/
Scott, B. (2020). Importance of Project Schedule and Cost Control in Project Management. Retrieved from globalknowledge.com: https://www.globalknowledge.com/us-en/Importance of Project Schedule and Cost Control in Project Management
Soltana, S., & Ashrafia, M. (2020). 'Predicting project duration and cost, and selecting the best action plan using statistical methods for earned value management'. Journal of Project Management, 157-166.
Trisanto, & Wardha, H. (2021). 'Analysis of Cost Control and Project Time in Performance Process with Earned Value Method Case Study: Improvement of Maliku-Bantanan Road in Pulang Pisau District, Indonesia'. International Journal of Innovative Science and Research Technology, 6(1), 101-107.
Tuyishime, P. (2020). 'Factors affecting time and cost performance of construction projects in Rwanda: A case study of high-rise building projects in Kigali'. MA theisis in Construction Management, University of Nairobi.
Urbanski, M., Ul-Haque, A., & Oino, I. (2019). The moderting role of risk management in project planning and project success: evidence from construction business of Pakistan and the UK. engineering management in production and services, 11(1), 23-35.
Vargas, C. A., Caracciolo, L., & Ball, P. J. (2022). 'Geothermal energy as a means to decarbonize the energy mix of megacities'. Communications Earth & Environment,, 3(1). Retrieved from https://doi.org/10.1038/s43247-022-00386-w
Widowati, E. D., & Rachmawati, F. (2020). 'Identifying factors affecting schedule and cost performance on building project'. 4th International Conference on Civil Engineering Research (ICCER 2020) (pp. 1-10). IOP Publishing.
World Bank. (2017). 'Results brief-Geothermal'. Retrieved from Worldbank.org: https://www.worldbank.org/en/results/2017/12/01/geothermal
Vecchio, D., Dy, A., & Qian, Y. (2016). 'Control theory meets synthetic biology'. Journal of the Royal Society Interface, 13(120), 381-390.
Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017). Investigating the relationship between communication-conflict interaction and project success among construction project teams. International Journal of Project Management, 35(8), 1466-1482.
Refbacks
- There are currently no refbacks.