ROLE OF MONITORING AND EVALUATION ON PERFORMANCE OF NATIONAL GOVERNMENT FUNDED RURAL ROADS CONSTRUCTION PROJECTS IN KENYA
Abstract
Roads projects in Kenya have been characterized by low rates of budget absorption with only about 60% of the budget spent in 2016. There also have been cost overruns of as much as 80% over the original contract amounts, and completion periods of twice the initial contract implementation period. This study therefore sought to examine the role of monitoring and evaluation on performance of rural roads construction projects in Kenya. Specifically, the study sought to establish the influence of human capacity on the performance of rural roads construction projects in Kenya and to identify the influence of financial capacity on the performance of rural roads construction projects in Kenya. This study adopted cross-sectional design research approach. The population of this study is all the 1,032 Professional Engineers as well as Civil and Structural Engineers registered by the Engineers Board of Kenya. The sample size of the study was 267 respondents. Primary data was collected through use of questionnaires. SPSS version 25.0 was used to code the data collected. Correlation analysis was used in establishing how the variables under investigation relate with each other. A multiple regression analysis was used to assess the relationship between the dependent and the independent variables. The study results were presented in tables and figures. The study concludes that human capacity has a positive and significant effect on the performance of rural roads construction projects in Kenya. In addition, the study concludes that financial capacity has a positive and significant effect on the performance of rural roads construction projects in Kenya. From the results, this study recommends that the road authorities in Kenya should ensure their project teams have adequate training and skills to implement road projects. In addition, the road authorities in Kenya should ensure the correct tools are applied to implement road projects. Further, the authorities should ensure the correct techniques are adopted
Key Words: Monitoring and Evaluation, Human Capacity and Financial Capacity
Full Text:
PDFReferences
Abdul-Rahman, H., Wang, C., & Muhammad, N. a. B. (2018). Project Performance Monitoring Methods Used In Malaysia And Perspectives Of Introducing Eva As A Standard Approach. Journal of Civil Engineering and Management, 17(3), 445-455.
Alsulamy, S., Wamuziri, S., & Taylor, M. (2018). Evaluation of key metrics for measurement of project performance Paper presented at the Procs 28th Annual ARCOM Conference, 3-5 September 2018, , Edinburgh, UK.
Amanchukwu, R. N., Stanley, G. J., & Ololube, N. P. (2015). A Review of Leadership Theories, Principles and Styles and Their Relevance to Educational Management Management, 5(1), 6-14.
Amin, M. (2005). Social Sciences Research,Conception, Methodology and Analysis. Kampala: Makerere University Press.
Anantatmula, V. S. (2010). Project Manager Leadership Role in Improving Project Performance. Engineering Management Journal, 22 ( 1), 13-23.
Anscombe, F. J. (1960). Rejection of outliers. Technometrics, 2, 123-147.
Apopa, V. A. (2018). Influence Of Supply Chain Management Practices On Performance Of Government Ministries In Kenya. (Doctor of Philosophy in Supply Chain Management ), Jomo Kenyatta University of Agriculture and Technology, Unpublished PhD Thesis, Juja.
Kamau, C. G., & Mohamed, H. B. (2015). Efficacy of Monitoring and Evaluation Function in Achieving Project Success in Kenya: A Conceptual Framework. Science Journal of Business and Management, 3(3), 82-84.
Kamau, P. M. (2017). Factors Influencing Performance of Monitoring and Evaluation Systemes in Non-Governmental Organizations Projects. (Master of Arts in Project Planning and Management of the University of Nairobi), University of Nairobi, Nairobi.
Kariungi, S. M. (2014). Determinants of Timely Completion of Projects in Kenya: A Case of Kenya Power and Lighting Company, Thika. ABC Journal of Advanced Research, 3(2), 9-20.
Kasomo, D. (2007). Research Methods in Humanities and Education. Eldoret: Zapf Chancery.
Kipkebut, D. J. (2010). Organisational Commitment and Job satisfaction in higher educational institutions: the Kenyan case. Middlesex University, Unpublished PhD thesis, Middlesex.
Kissi, J., Dainty, A., & Tuuli, M. (2013). Examining the role of transformational leadership of portfolio managers in project performance. International Journal of Project Management, 31(4), 485-497.
Kithinji, C., Gakuu, C., & Kidombo, H. (2017). Resource Allocation, Evaluational Capacity Building M&E Results Utilization Among Community Based Organizations in Meru County in Kenya. European Scientific Journal 13(16), 283-304.
KRB. (2015). KRB-F Contract Portfolio Report for Financial Year 2014-15: Kenya Roads Board.
Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurements, 30, 607-610.
Kusek, J. Z., & Rist, R. C. (2018). Building results-based monitoring and evaluation systems: Assessing developing countries readiness Zeitschriftfuer Evaluation, 1, 151-158.
Lancaster, G. A., Dodd, S., & Williamson, P. R. (2010). Design and analysis of pilot studies: recommendations for good practice. Journal of Evaluation in Clinical Practice, 10(2), 307-312.
Lee, M. (2014). Transformational Leadership: Is It Time For A Recall? International Journal of Management and Applied Research, 1(1), 18-29.
McIntyre, S. M. (2018). Human Capital Theory “At Work”: The Generalists Meet the Symbolic Analysts in a Changing Workplace and Marketplace. Athabasca University. Calgary, Alberta.
Mehrotra, S. (2013). The Government Monitoring and Evaluation System in India: A Work in Progress. In I. E. Group (Ed.), ECD Working Paper Series ● No. 28. Washington, DC 20433: The World Bank Group.
Mugenda, O. M., & Mugenda, A. G. (2003). Research Methods: Quantitative and Qualitative Approaches. Nairobi: African Centre for Technology Studies Press.
Mugenda, O. M., & Mugenda, A. G. (2008). Research Methods; Quantitative and Qualitative Approaches. Nairobi: Acts Press.
Murungi, M. N. (2015). Influence Of Project Management Practices On Implementation Of Donor Funded Education Projects In Kajiado County, Kenya. (Master Of Arts In Project Planning And Management), University of Nairobi, Nairobi, Kenya.
Musomba, K. S., Kerongo, F. M., Mutua, N. M., & Kilika, S. (2013). Factors Affecting The Effectiveness Of Monitoring And Evaluation Of Constituency Development Fund Projects In Changamwe Constituency, Kenya. Journal of International Academic Research for Multidisciplinary, 1(8), 175-216.
Mwangu, A. W., & Iravo, M. A. (2015). How Monitoring and Evaluation Affects the Outcome of Constituency Development Fund Projects in Kenya: A Case Study of Projects in Gatanga Constituency. International Journal of Academic Research in Business and Social Sciences, 5(3), 13-31.
Nannei, C. (2018). Monitoring and evaluation framework for the Global Strategy and Plan of Action on Public Health, Innovation and Intellectual Property. New York.
Nenni, M. E., Arnone, V., Boccardelli, P., & Napolitano, I. (2014). How to Increase the Value of the Project Management Maturity Model as a Business-oriented Framework. International Journal of Engineering Business Management, 6(8).
Njama, A. W. (2015 ). Determinants Of Effectiveness Of A Monitoring And Evaluation System For Projects: A Case Of Amref Kenya Wash Programme (Degree of Master of Arts in Project Planning and Management ), University of Nairobi Nairobi.
Njenga, B. K. (2014). Factors Influencing Effective And Efficient Delivery Of Road Construction Projects In Kenya: A Case Of Nairobi County. University of Nairobi, Unpublished Master of Arts in Project Planning and Management Thesis, Nairobi.
Nordhaug, O. (1993). Human capital in organizations: Competency, training and learning
Obare, J. O. (2017). Project Team Diversity, Implementation Process of Project Control Systems and Performance of Rural Roads Construction Projects in Kenya. (Doctor of Philosophy in Project Planning and Management), University of Nairobi, Nairobi.
Ofori-Kuragu, J. K., Baiden, B. K., & Badu, E. (2016). Key Performance Indicators for Project Success in Ghanaian Contractors. International Journal of Construction Engineering and Management, 5(1), 1-10. doi: 10.5923/j.ijcem.20160501.01
Ogutu, B. O., & Muturi, W. (2017). Factors Influencing Successful Completion Of Road Construction Projects In Kenya: The Case Of Kisumu County. International Journal of Economics, Commerce and Management, United Kingdom, V(6), 728-771.
PricewaterhouseCoopers LLP. (2018). Insights and Trends: Current Portfolio, Programme and Project Management Practices-The third global survey on the current state of project management: PricewaterhouseCoopers LLP
Wafula, E. F. (2017). Factors Influencing Road Projects Performance in Kenya: A Case of Road Contractors in Machakos County. University of Nairobi, Unpublished Master of Arts in Project Planning and Management Thesis, Nairobi.
Wagana, D. M. (2017). Effect Of Governance Decentralization On Service Delivery In County Governments In Kenya. (Doctor Of Philosophy (Leadership and Governance)), Jomo Kenyatta University of Agriculture and Technology, Nairobi.
Zaltsman, A. (2009). The Effects of Performance Information on Public Resource Allocations: A Study of Chile's Performance-Based Budgeting System. International Public Management Journal, 12(4), 450-483.
Zvoushe, H., & Zhou, G. (2013). Utilisation of Monitoring and Evaluation Systems by Development Agencies: The Case of the UNDP in Zimbabwe. American International Journal of Contemporary Research, 3(3), 70-83.
Refbacks
- There are currently no refbacks.