PROJECT PLANNING PRACTICES ON THE IMPLEMENTATION PERFORMANCE OF PUBLIC BUILDING PROJECTS IN NAIROBI COUNTY
Abstract
Public infrastructure projects are key in the delivery of services to citizens and residents of a given country. Over the years, we have experienced a number of projects being completed within the specified timeline and cost. However, some of the projects end up stalling. The stalling of projects have been witnessed in both private and public sectors globally. Although the stalling of projects is a global phenomenon in both developed and developing economies, many stalling projects have been witnessed in developing countries. Studies have revealed Kenya is losing a lot of public funds through stalled projects. This study therefore sought to examine the effect of project planning practices on the implementation performance of public building projects in Nairobi County. Specifically, the study sought to determine the project scope planning and communication planning practices on the implementation performance of public building projects in Nairobi County. This study used a descriptive research design. The sample size was as follows forty (40) Architects, sixty-five (65) Engineers, twenty (20) Quantity Surveys from the State Department for Public Works, fifteen (15) Accountant and Heads of Procurement and Purchasing Departments from various Ministries, and ten (10) Contractors in the ministries. Both descriptive and inferential statistics were adopted for the study. The quantitative data was analyzed by using descriptive statistics which included frequency distribution tables, mean, standard deviation, and measures of relative frequencies. The inferential statistics included correlation analysis and regression analysis. A regression model was used to establish the relationship between variables. The quantitative data was presented in various forms such as tables, graphs, and charts. A Multiple regression model was used to establish the relationship between variables. The study concludes that project scope planning had a positive and significant effect on the implementation performance of public buildings. The study also concludes that communication planning has a positive and significant effect on the implementation performance of public buildings. Based on the findings, the study recommends therefore that project scope planning be done before the implementation of the project. The study also recommends that communication planning be done before the implementation of project.
Key Words: Project Planning Practices, Scope Planning, Communication Planning, Implementation Performance of Public Building Projects In Nairobi County
Full Text:
PDFReferences
A Guide to the Project Management body of Knowledge. (2013). Project Management Institute,.Grimshaw, S. (2014). When will you think differently about programme Delivery. 4th Global Portfolio and Programme Survey.
Auma, E. (2014). Factor Affecting the Performance of Construction Project in Kenya.
Bass, B. M. (1991). Bass and Stogdill's handbook of leadership: Theory, research and managerial applications. New York: The Free Press.
Boleslaw Rok, (2009) Ethical context of the participative leadership model: taking people into account, Corporate Governance: The international journal of business in society.
Cho, C. and Gibson Jr., G. (2001). ”Building Project Scope Definition Using Project Definition.
Hartman, F., & Ashrafi, R. (2004). Development of the SMARTTM Project Planning framework. International Journal of Project Management, 22(6), 499-510.
Nutt, P. C. (1983). Implementation Approaches for Project Planning. Academy of Management Review, 8(4), 600-611.
Kerzner, H. (2006), Project Management: Systems Approach to Planning Scheduling and Control (9th edition). New York: Wiley Press.
Mugenda, A., & Mugenda A. G. (1999). Research methods: quantitative and qualitative Approaches. Nairobi: Acts Press.
PMI (2014). Guide to the Project Management Body of Knowledge. Pennsylvania: project Management Institute.
Yang, J., Mei-Yi C. & Kuei-Mei H., An Empirical Study of Schedule Delay Causes Based on Taiwan"s Litigation Cases. Project Management Journal 2013.
Young (2009) Understanding the research process and methods. Introduction to Research Methods. Las Vegas: Acts Press.
Refbacks
- There are currently no refbacks.