PROJECT MANAGEMENT PRACTICES AND IMPLEMENTATION OF RENEWABLE ENERGY PROJECTS IN KENYA

Paul Baru Maina, Dr. Phyllis Mbutu

Abstract


Project implementation assesses all processes, operations and resource utilization of a project. Implementation of projects is determined by many factors such as resource allocation, planning, and management. The study aimed to find out project management practices and implementation of renewable energy projects in Kenya. The specific objectives were to establish the effect of contract administration and relationship management on implementation of renewable energy projects in Kenya. The theories that guided this study were resource-based theory and stakeholder theory. This study used a descriptive design with questionnaire as the instrument for data collection. Reliability of the study instrument was established using Cronbach Alpha, internal consistency method. Validity of the research instrument was determined using content, face and construct validity. The target population was 45 renewable energy projects in Kenya. The unit of observation was one project engineer from the renewable energy projects.The study conducted a census on all the projects. Data collected was analyzed using SPSS version 28 to produce frequencies, descriptive and inferential statistics were used to derive conclusions. The study conducted a multiple regression analysis to determine the relationship between project management practices affecting implementation and success of renewable energy projects. The study concluded that contract administration has the most positive significant influence on implementation of renewable energy projects in Kenya. The study also concluded that relationship management has a positive and significant influence on implementation of renewable energy projects in Kenya. Based on the findings, the study recommends that project managers and stakeholders involved in implementing renewable energy projects should ensure frequent contract monitoring, provide adequate resources for project implementation and ensure availability of capacity building to improve project implementation. In addition, the study recommends establishment of clear conflict management guidelines to prevent any hindrances to project implementation success.

 

Key Words: Project Management Practices, Contract Administration, Relationship Management, Implementation of Renewable Energy Projects


Full Text:

PDF

References


Adler, T., & Smith, W. (2019). How organizational cost reporting practices affect project management: the issues of project review and evaluation. 2009International Journal of Project Organization and Management, 13.

Byamukama, B. (2019). Performance contract and social service delivery - lessons from

Rwanda. Retrieved from

http://www.genocideresearchhub.org.rw/document/performance-contracts-social-

service-delivery-lessons-Rwanda/

Daritsu, E. (2022). Performance Contracting and Service Delivery in County Governments in Kenya: A Case of Kakamega County [Unpublished master's thesis]. Pan Africa Christian University.

Gitonga, J.M., Muchelule, Y., & Nyang’au, S. (2022). Project Cost Management and Performance of Urban Renewable energy projectsin Kenya. Journal of Entrepreneurship and Project Management, 2(5), 21-28.

Goldratt, E. M., & Cox, J. (1984). The goal: excellence in manufacturing. North River Press.

Grapinet, G.(2018). Public sector performance contracting in France: A case study of

performance contracting and the management of local services of the Directorate

General for Taxes. Paris: OECD. Retrieved from;

Kinanga, R.O. & Partoip, S., (2019) Effects of Target Setting in Performance Contracting on

Employees Performance in Kenyan Public Enterprises. 20th IBIMA Conference,

Kuala Lumpur, Malaysia, 25-26 March 2019.

Kundu, D., Gariy, Z., & Nyomboi, T. (2023). Assessment of level of service for roads under performance-based road maintenance in Kenya. International Journal of Technology and Systems, 8(1), 45-57.

Ling, Y., & Li, Q. (2019). Managing the Development & Construction of Public Hospital Projects. Materials Science and Engineering, 471(2).

Love, P., & Ikab, L. (2022). Making Sense of Hospital Project MisPerformance: Over Budget, Late, Time and Time Again—Why? And What Can Be Done About It? Research Engineering Management, 12, 183-201.

Metawie, M., & Gilman, M. W. (2019). Problems with the implementation of performance

measurement systems in the Public Sector where performance is linked to pay: A

literature review drawn from the UK. A paper presented at the 3rd Conference on

performance measurements, Nice UK. Retrieved from http://www.studymode.com

Nor, M., Rahmat, M., Azmi, N., & Rahim, M. (2022). Challenges of cost management technique implementation during pre-tender in Klang valley construction project. Web of Conferences, 347.

Obong'o, S. (2019). Implementation of Performance Contracting in Kenya. International

Public Management Review.

Omondi, J. (2019). A Study on Effects of Performance Contracting Implementation on

Service Delivery at Kenya Ports Authority, 4(6), 34-45.

Ong'ondo, C., Gwaya, A., & Masu, S. (2019). Appraising the Performance of Construction Projects during Implementation in Kenya, 1963-2018: A Literature Review Perspective. Journal of Construction Engineering and Project Management, 1(2), 1-24.

Onyango, J. (2021). Cost Management and Implementation of Construction Projects in Elgeyo Marakwet County, Kenya [Unpublished master's thesis]. Kenyatta University.

Rana, K. (2018). Research on the Influence of Risk on Construction Project Performance: A Systematic Review. Sustainability, 14, 6412.

Salome C., Korir1, R & Joseph B. (2019). Performance Management and Public Service

Delivery in Kenya. European Journal of Research and Reflection in Management

Sciences, 3(4), 2056-5992.

Seltman, H.J. (2014). Experimental Design and Analysis. Carnegie Melon University.

Schönbeck, P., Löfsjögård, M., & Ansell, A. (2020). Framework for change control in healthcare construction projects compared to current practice. International Journal of Construction Management, 22(12), 2405-2412.

Smith, S. (2021). Project Planning and Performance of Construction Industry: Perspective from the United States of America. Stratford, 5(1).

State Enterprise Commission (SEC). (2018). Review of Legal and Institutional Framework of SOEs, Accra, Ghana.

Sulle A. (2019). The Use of Performance Measurement Information in the Tanzanian Public

Sector: The Case of National Housing Corporation. International Journal of

Management Sciences and Business Research, 3(7), 2226-8235).

Waithiki, K., W. & Kihara, A. (2017). Influence Of Effective Strategic Planning on Performance of Firms in the Energy Sector in Kenya. International Journal of Strategic Management, 6(9)32 – 51.

Wauters, M., & Vanhoucke, M. (2018). A comparative study of Artificial Intelligence methods for project duration forecasting. Expert Systems with Applications, 46, 249–261.

World Bank. (2019). World Development Report 2019 : Reshaping Economic Geography.

Washington DC: World Bank.

Yaw N. & Hadija N. (2019). Evaluating Performance Contracting as a Tool for Evaluating

State-Owned Enterprises in Two Developing Countries: A Look at the Performance

Dimensions. Public Policy and Administration Research 5(9).

Yeri, T. (2018). Determinants Of Successful Implementation of Infrastructure Projects in Devolved Units in Kenya: A Case of Kilifi County, Kenya [Unpublished doctoral dissertation]. University of Nairobi.


Refbacks