Abstract


Risk and uncertainty are inherent to projects and the incidence of risk in agricultural projects is important to policymakers at national and international levels. Agricultural projects are subject to a wide range of risks due to the variable economic and biophysical environment in which farming operates. The general objective of this study was to investigate the relationship between risk management processes and the performance of National Irrigation Board projects in Kenya. Specifically, the study analysed the relationships between risk identification, on the perfomance of National Irrigation Board projects. The study also examined the moderating effect of stakeholders management on the relationship between risk management processes and the performance of National Irrigation Board projects. The National Irrigation Authority projects in Kenya were chosen as it is mandated to oversee the performance of national irrigation projects in Kenya. This study was anchored on five theories, namely; theory of change, enterprise risk management theory, uncertainty theory, and stakeholder theory. This study adopted a descriptive research design and a positivism research philosophy. The target population of this study was the staff in all the 8 irrigations schemes under National Irrigation Board. The irrigation schemes include Mwea Irrigation Scheme, Bura Irrigation Scheme, Tana hola irrigation Scheme, Perkerra Irrigation Scheme, Ahero Irrigation Scheme, Bunyala Irrigation Scheme, and West Kano Irrigation Scheme. The unit of observation was staff members under managers, deputy managers, supervisors, farm project managers, project team leaders, and farmers representatives. The study used a questionnaire for data collection. Primary data was collected using structured questionnaires and data was analyzed using SPSS. The study used stratified random sampling to select 205 staff from the target population. Proportionate sampling was used to select the number of staff per category. A pilot test was conducted to test the reliability and validity of the data collection instruments. The study conducted various tests including normality tests, multicollinearity, heteroscedasticity, and autocorrelation tests. The test of the hypothesis was done at a 95% confidence interval. The statistics generated were descriptive statistics and inferential statistics. The study found that risk identification positively and significantly relates with performance of NIA projects in Kenya. The study thus recommends management of irrigations schemes under National Irrigation Board to improve the practice of risk identification within their organization in order to improve their performance.

Key Words: risk management processes, risk identification, stakeholders management

Full Text:

PDF

References


Ammar, A., Berman, K., & Sataporn, A. (2017). A survey of procedures for hazard the executives in ventures. Benchmarking: An International Journal, 14(1), 22-36.

Andriof, J., & Waddock, S. (2017). Unfolding stakeholder engagement. In Unfolding stakeholder thinking (pp. 19-42). Routledge.

Antwi-Agyei, P., Cairncross, S., Peasey, A., Price, V., Bruce, J., Baker, K., & Ensink, J. (2015). A farm to fork risk assessment for the use of wastewater in agriculture in Accra, Ghana. PloS one, 10(11), e0142346.

Awodele, O. A., Ogunlana, S. O. & Motawa, I. (2009). Understanding and Managing Risks Necessary Condition for Success and Sustainability of Privately Finance Market Projects in Nigeria. Proceedings of the Fourth 69 International Conference for Post-graduate Researchers of the Built and Natural Environment at Glasgow Caledonian University, Scotland.

Cafiero, C., Capitanio, F., Cioffi, A., & Coppola, A. (2017). Risk and crisis management in the reformed European agricultural policy. Canadian Journal of Agricultural Economics/Revue canadienne d'agroeconomie, 55(4), 419-441.

Cagno, E., Caron, F., & Mancini, M. (2007). Multi-Dimensional analysis of major risks in complex projects. Risk Management: 1–18.

Callahan, B. a. (2010). Construction Delay Claims Fourth Edition. USA: Wolters Kluwer Law & Business.

Chambers, R.(2010). Development and Change: Submitted to Development and Change; For definitive Version. http://onlinelibrary.wiley.com/journal/10.1111/(ISSN)1467-7660.

Chance, D.M. & Brooks, R. (2016). Introduction to Derivatives and risk management.

Chang, A., Bertram, M., Ivanochko, T., Calvert, S., Dallimore, A. & Thomson, E.R. (2013). A Selection and Application of Risk Management Tools and Techniques for Build –Operate Transfer Projects.

Kuang Z. (2011). Risk Management in Construction Projects: Application of Risk Management in Construction Period. Bachelor of Architectural Technology and Construction Management.Via University College, Horsens Campus, Denmark.

Kultar, S., (2007). Quantitative Social Research Methods. SAGE Publishing, India.

Kumi-Boeteng, B., Ziggah, Y.Y., Youjian, H. & Amans, C.O. (2012). Regression Models for 2-Dimension Cartesian Coordinates Prediction: A Case Study at the University of Mines and Technology(UMaT).Tarkwa-Ghana.

Kwak, D. W., Rodrigues, V. S., Mason, R., Pettit, S., & Beresford, A. (2018). Risk interaction identification in international supply chain logistics: Developing a holistic model. International Journal of Operations & Production Management, 38(2), 372-389.

Li, Y. (2016). Water-saving irrigation in China. Irrigation and Drainage: The journal of the International Commission on Irrigation and Drainage, 55(3), 327-336.

Lindlof, T. R., & Taylor, B. C. (2017). Qualitative communication research methods. Sage publications.

Luwesi, C. N., Kinuthia, W., Mutiso, M. N., Akombo, R. A., Doke, D. A., & Ruhakana, A. (2015). Climate change, pro-poor schemes, and water inequality: strengths and weaknesses of Kauai Irrigation Water Users’ Association, Kenya. The Nordic Africa Institute.

M. Regan, (2011) SSUD71-209 Risk Management course notes. Bond University, Gold Coast,

Mackinnon, J. (2008). Durbin-Watson Statistic; The SAGE Encyclopedia of Social Science Research Methods.

Mahamid. (2012). Causes of Delay in road construction projects. Management in Engineering (28), 300-310.

Maxwell, J. A. (2012). Qualitative research design: An interactive approach (Vol. 41). Sage publications.

Mbeche I. G., (2013) Risk management in Building Projects: An Analysis of Time and Cost Risk. Journal of Management, (6) May-September, 2003.

McCoy, K.L., Ngari, P. N., & Krumpe, E., (2015). Building Monitoring, Evaluation, and Reporting Systems for HIV/AIDS Programs. Pact. The United States of America.

Memon, A.H., Abdul Rahman, I. & Abdul Azis, A.A. (2011) Preliminary study on causative factors leading to construction cost overrun. International Journal of Sustainable Construction Engineering and Technology, 2(1).

Miles, S. (2017). Stakeholder theory classification: A theoretical and empirical evaluation of definitions. Journal of Business Ethics, 142(3), 437-459.

Miruri, K.R (2017) Determinants of Performance of Irrigation Projects: A Case of Nthawa Irrigation Project of Mbeere North Sub County, Embu County, Kenya.

Muchelule, Y., Mbawi, G., & Muchelule, S. A. (2017). Influence of Monitoring and Evaluation on Performance of Constituency Development Fund Projects In Kajiado East Sub-County, Kenya. The International Journal of Management Science and Information Technology (IJMSIT) Issue 23 (12 - 26).

Muema, F., Home, P., & Raude, J. (2018). Application of Benchmarking and Principal Component Analysis in Measuring Performance of Public Irrigation Schemes in Kenya. Agriculture, 8(10), 162.

Muema, F., Home, P., & Raude, J. (2018). Application of Benchmarking and Principal Component Analysis in Measuring Performance of Public Irrigation Schemes in Kenya. Agriculture, 8(10), 162.

Mutula, M. W., (2013). Effects of Human Resource Factors on Project Performancein Nairobi County in Kenya: A Case of Selected Organizations in Westlands.

Mwatete, G., Sumukwoa, J., Kipkorir, E., & Kipkoech, A. (2018). Comparing the Economic Performance of Two Rice Technologies in West Kano Irrigation Scheme, Kenya. Africa Environmental Review Journal, 2(2), 93-106.

Ngenoh, E., Kirui, L. K., Mutai, B. K., Maina, M. C., & Koech, W. (2015). Economic determinants of the performance of public irrigation schemes in Kenya. Journal of Development and Agricultural Economics, 7(10), 344-352.

Ngigi, S. (2012). Review of irrigation development in Kenya. The changing face of irrigation in Kenya: Opportunities for anticipating a change in eastern and southern Africa, 14, 35-54.

NIB (2017). National Irrigation Board Report. Retrieved from https://nib.or.ke/ on 30th May 2019.

Njoroge, R.(2013). Relationship Between Financial Literacy and Entrepreneurial success in Nairobi County Kenya.(Thesis Dissertaion, Univerity of Nairobi)

Nyambare, E.N. (2013). An Investigation of the Causes and Effects of Cost Overrun on Civil Works Projects in Mombasa County. Unpublished thesis Kenyatta University.

Odedeh, G.J.O(2016). Strategic Practices and Performance of National Irrigation Board of Kenya.

Odeyinka, H. A., Oladapo, A. A. & Dada, J. O. (2017). An Assessment of Risk in Construction in the Nigerian Construction Industry. International Symposium on Globalisation and Construction, Construction in Developing Economies,

Ondiek, S. & Muathe, S. (2017), Risk Management Strategies and Performance of Small Scale Agribusiness Firms in Kiambu County.

Pervez.A.K.M.K, Gao, Q&Uddin, Md.E.(2016). The Management of Agricultural Risk in Bangladesh: A Proposed Process: Asian Journal of Agricultural Extension, Economics & Sociology, Vol. : ISSN: 23207027

Quinlan, C., Babin, B., Carr, J., & Griffin, M. (2019). Business research methods. South Western Cengage.

Rabbani, D.(2011). Problems of Projects and Effects of delays in the constructtion industry of Pakistan.Australian Journal of Business and Management Research ( 1), 41-50.

Regan, R. (2011). Communicating actionable risk for terrorism and other hazards. Risk Analysis. Online preview.

Rooyen, A. F., Ramshaw, P., Moyo, M., Stirzaker, R., & Bjornlund, H. (2017). Theory and application of agricultural innovation platforms for improved irrigation scheme management in Southern Africa. International Journal of Water Resources Development, 33(5), 804-823.

Ruler IV (2016). Cover Governance for South Africa, and the Draft Code of Governance Principles, Institute of Directors Southern Africa, Pretoria

Sahu, P.K.. (2013).Research Methodology: A Guide for Researchers In Agricultural Science, Social Science and Othre Related Fields.

Sambasivan, M., & Soon, Y. W. (2017). Causes and effects of delays in Malaysian construction industry. International Journal of project management, 25(5), 517-526.

Tangermann, S. (2011). Risk management in Agriculture and the Future of the EU’s Common Agricultural Policy. Issue Paper, 34.

Taylor, S. J., Bogdan, R., & DeVault, M. (2015). Introduction to qualitative research methods: A guidebook and resource. John Wiley & Sons.

The government of Kenya (2013).Economic Survey Highlights 2013. Government Printers Nairobi.

The government of Kenya (2013) Sessional paper No.2 of 2012 on Kenya Vision 2030.Nairobi. Government printers

Ullah, R., Shivakoti, G. P., Kamran, A., & Zulfiqar, F. (2016). Farmers versus nature: managing disaster risks at farm level. Natural Hazards, 82(3), 1931-1945.

Valipour, M. (2013).The necessity of Irrigated and Rainfed Agriculture in the World. Irrigation Drainage Sys Eng S9: e001. doi:10.4172/2168-9768.S9-e001.

Winch, G., 2012. Managing construction projects, an information processing approach. Oxford: Blackwell Publishing.

World Bank, The World Bank data: Bangladesh; 2015. Retrieved from http://data.worldbank.org/country/bangladesh on 3rd June 2019.

World Food Programme.(WFP). (2011).The State of Food Security in he World; Rome 2011:Fund for Agricutural Development.

Yang, J., & Wei, P. (2010). Causes and effects of delays in the planning and design phase. Journal of Architectural Engineering, 16(2), 80-83.

Yoe, C. (2016). Primer on risk analysis: decision making under uncertainty. CRC press.

Zwikael, O. & Ahn, M. (2011), The effectiveness of risk management: An analysis of project risk planning across SMEs industries and countries. Risk analysis, 1(31) 25- 37.


Refbacks

  • There are currently no refbacks.