STAKEHOLDER ENGAGEMENT AND SUSTAINABILITY OF PROGRAMS IN THE MINISTRY OF LABOUR AND SOCIAL PROTECTION IN KISII, COUNTY KENYA
Abstract
Sustainability of a project ensures that project benefits are felt for extended periods of time that can justify the economic and social input invested in to the project. Stakeholder engagement plays key role in the development and implementation of projects, and in ensuring the success of projects. The purpose of this study was to determine the effect of stakeholder engagement on sustainability of programs in the ministry of labour and social protection, Kiambu County. The study objectives were to establish effect of stakeholder mapping, and communication on sustainability of projects in the ministry of labour and social protection, Kiambu County. The study was guided by stakeholder theory and Communication theory. The study adopted a descriptive survey design. The study targeted the County Social Development Officer (1), Assistant social development officers in every sub-county (9), sub-county Community development extension officers (45), and sub-county Community Health Volunteers (45). The study employed a census to sample all the 100 respondents. The study used questionnaires to collect primary data. The study conducted a pilot with 10 staff representing 10% of the sample size. The study used content and face validity. Reliability was tested using Cronbach’s alpha. Data was analyzed using SPSS Version 28 to generate descriptive and inferential statistics. The pilot findings were presented in Tables. Findings show that; there is a strong significant relationship between stakeholder mapping and program sustainability (r=0.607, p=0.000), and a strong significant relationship between stakeholder communication and program sustainability (r=0.562, p=0.000). The recommendations are; there is need to map appropriately the value of the stakeholders in the program which will help in ensuring that only the stakeholders who add value to the program are considered and program managers should adopt innovative communication channels that foster fast and effective communication with stakeholders.
Key Words: Stakeholder Engagement, Stakeholder Mapping, Stakeholder Communication, Sustainability, Ministry of Labour and Social Protection, Kiambu County
Full Text:
PDFReferences
Alqaisi, I. F. (2018).The effects of stakeholder’s engagement and communication management on projects success. MATEC Web of Conferences, 162, EDP Sciences
Barasa, F. &Jelagat, T. (2013). Community Participation in Project design, Management and Implementation: Building the Foundation for Sustainable Development. International Journal of Current Research, 5 (2), 398-401
Bell, E., Bryman, A., & Harley, B. (2018).Business research methods.Oxford university press.
Binder, J. (2015).An investigation into the requirements and practices for global project management in the information systems department of a global organization. Unpublished Masters Thesis, Heriot-Watt University.
Boma Orawari, L. (2018). Stakeholder Relationship Management and Project Performance in Public Institutions in Rivers State Nigeria. Afribary. Retrieved from https://afribary.com/works/dissertation
Di Maddaloni, F., & Davis, K. (2017). The influence of local community stakeholders in megaprojects: Rethinking their inclusiveness to improve project performance. International journal of project management, 35(8), 1537-1556
Dobrovolskienė, N., Tvaronavičienė, M., &Tamošiūnienė, R. (2017). Tackling projects on sustainability: A Lithuanian case study. Entrepreneurship and Sustainability Issues, 4(4), 477–488
Fonseca, L., Ramos, A., Rosa, A. & Braga, A. (2016). Stakeholders satisfaction and sustainable success. International Journal of Industrial and Systems Engineering, 24(2) 144.
Gachie, W. (2019). Project Sustainability Management: Risks, Problems and Perspective. Problems and Perspectives in Management, 17(1), 313 – 325.
Kamalirad, S., Kermanshachi, S., Shane, J., & Anderson, S. (2017). Assessment of construction projects’ impact on internal communication of primary stakeholders in complex projects. In Proceedings for the 6th CSCE International Construction Specialty Conference
Kaur, A. & Lodhia, S. (2018). Stakeholder engagement in sustainability accounting and reporting: A study of Australian local councils. Accounting, Auditing & Accountability Journal,31(1) 338-368
Kosgei, N. (2021). Stakeholder Consultation and Implementation Water Projects: A Case of Machakos County, Kenya. East African Journal of Business and Economics, 4(1), 14-21.
Ladhani, S., & Sitter, K. C. (2020). Conditional cash transfers: A critical review. Development Policy Review, 38(1) 28-41
Luhombo, A. (2022). Stakeholder management process and sustainability of corporate social responsibility projects in technical and vocational institutions in Western Kenya.Unpublished Doctorate Thesis, Jomo Kenyatta University of Agriculture and Technology.
Machange, W. &Fujo, H.(2021). Effective Management: A Key to Stakeholder Satisfaction Performance in Project-Based Organizations. International Journal of Economics and Management Science, 10(9) 1-8
Mannetti, L. M., Göttert, T., Zeller, U., &Esler, K. J. (2019). Identifying and categorizing stakeholders for protected area expansion around a national park in Namibia. Ecology and Society, 24(2).
Mugata, R. J. and Muchelule Y. (2018).Effect of Stakeholder Analysis on Performance of Road Construction Projects in ElgeyoMarakwet, County.International Journal of Research in Education and Social Sciences,1 (2), 88-106.
Nguyen, T. S., & Mohamed, S. (2020). Mediation Effect of Stakeholder Management between Stakeholder Characteristics and Project Performance.Journal of Engineering Project and Production Management, 11(2), 102–117.
Ochunga, F. O. &Awiti, L. H. (2017).Influence of Stakeholder Participation on Sustainability of Community Development Projects Implemented by Plan International in Homa Bay Town Sub-County, Kenya.International Journal of Academic research in Business and Social Sciences, 7 (4) 1
Ouma, M., &Adésínà, J. (2019). Solutions, exclusion and influence: Exploring power relations in the adoption of social protection policies in Kenya. Critical Social Policy, 39(3)376-395.
Sanghera, P. (2019). Monitoring Stakeholder Engagement and Communication. In P. Sanghera (Ed.), PMP® in Depth: Project Management Professional Certification Study Guide for the PMP® Exam (pp. 519–533). Apress.
Singh, M., Gmyrek, A., Hernandez, A., Damon, D., & Hayashi, S. (2017). Sustaining Screening, Brief Intervention and Referral to Treatment (SBIRT) services in health-care settings.Addiction, 112, 92–100. d
Tero, J. (2014). Factors Influencing Performance of Constituency Development Funded Dispensary Projects in Kenya: A Case of Nandi County. Unpublished Masters’ Thesis, University of Nairobi, Kenya
Refbacks
- There are currently no refbacks.