DETERMINANTS OF EFFECTIVE IMPLEMENTATION OF FIBER OPTIC CABLE PROJECTS IN KENYA

OCHIENG DANIEL OMENDA, DR. KARANJA PATRICK NGUGI

Abstract


This study examined the determinants of effective implementation of fiber optic cable projects in Kenya. Findings from various sources have indicated that most Telecommunication organizations are slowly embracing fiber optic cable technology, but the implementation process of these projects remains a challenge, due to the failures of well-formulated strategies at critical stages of implementation. To achieve the study’s general objective, which was examining the determinants of effective implementation of fiber optic cable projects in Kenya, a descriptive survey sample of 290 approved fiber optic cable projects was undertaken in Kenya by the major Telecommunication Service Providers and the National government shall be carried out and was based on the opinion of sampled key informants in these projects i.e. technical personnel and project managers. To outline the key concepts, the study was based on various theories i.e. resource dependency, stakeholder’s theory, Rogers innovation diffusion theory and the theory of constraints. The sampling frame was made of 290 different fiber optic cable projects where random sampling method shall be used. Data was collected using structured questionnaires and analyzed using the SPSS (v.23.0) tool. Statistical inferences were used to analyze the data collected in terms of reliability and validity after a pilot study has been conducted. Both tests of significance using regression and correlation analysis were used to indicate the significance level amongst the independent variables when assessed against the dependent variable. The indicators relating to project team management, budgetary control, communication management and logistics management variables were analyzed to find out if they had a great significance on implementation of these fiber optic cable projects and conclusions were drawn on their effectiveness in the same. The study found that project team management budgetary control, communication management and logistics management is statistically significant to effective implementation. The study concluded that project team management budgetary control, communication management and logistics management is positively related to effective implementation.The study recommends that the project team should have the necessary skills and knowledge required for the project to ensure effective and effecient implementation. The project team should ensure that budget is well set before the start of the implememnation. Proper communication channels should be used, the selected channels should ensure that information is delivered at the right time to avoid delay of some activities.


Full Text:

PDF

References


Abok, A. M. (2013). Factors Affecting Effective Implementation of Strategic Plans In Non-Governmental Organizations In Kenya. Nairobi Kenya: Unpublished PhD work, JKUAT.

Anfara, V. A., Jr, & Mertz, N. T. (2006). Theoretical Frameworks in Qualitative Research. Thousand Oaks: CA: Sage.

Anyanwu, L. U. (2003). Project Management in a Developing Nation. Onitsha: Africana-Feb Publishers.

Babani, S., Bature, A., Faruk, M., & Dankai, N. (2014). Comparative Study between Fiber Optic and Copper in Communication. International Journal of Technical Research and Applications; Vol 2(2), 59-63.

CA(K). (2016, January - March). Research & Statistics: Quarterly Sector Statistics Report. Retrieved from Communication Authority of Kenya Website: http://www.ca.go.ke

Dahunsi, F. ( 2015). Broadband Infrastructure Using Fiber Optic: State of things in a Developing Economy. African Journal of Computing & ICT, Vol 8. No. 3, 77-88.

Dorfman, M., Hanges, A., & House, &. R. (2012). A twenty year Journey into the Intriguing World of Culture and Leadership. World Business Journal.

Freeman, R. E. (2010). Stakeholder Theory of the Modern Corporation. New York: Cambridge University Press.

Hatch, M. (August, 2013). Resource Requirements and Environmental Dependency. European Scientific Journal Vol. 12.

Hecht, J. (2015). Understanding Fiber Optics. Massachusetts: Laser Light Press.

Jadhav, R. A., & Shitole, D. S. (2013). Fiber Optics Communication and Applications. International Journal of Innovative Research in Engineering & Science ISSN 2319-5665 2(4), 1-9.

Kerretts-Makau, M. (2012). Internet Governance In Kenya –An Assesment. Nairobi: ICT development Associates.

Moenga, R. O., & Moronge, D. M. ( 2016). Determinants of Effective Utilization of Broadband Infrastructure Projects in Kenya: Case of National Optical Fiber Backbone Infrastructure Project Phase 1. The Strategic Journal of Business & Change Management Vol. 3, Iss. 2(22), 484-514.

Msimang, M. (2011). Broadband in Kenya: Build it and they will come. Washington DC: InfoDev/World Bank.

Nguluu, B. (2003). Community Participation in the Implementation of CDF Projects in Kenya. Opprotunities and Challenges. Nairobi, Kenya: University of Nairobi Press.

Nutt, P. C. (1996). Tactics of Implementation. The Academy of Managemment Journal, Vol. 29, No. 2, 230-261.

Okuttah, M. (2012). KDN Plans sale of Stake to recover from losses. Kenya: Business Daily Africa.

P.Slevin, D., & Pinto, J. K. (1987). Balancing Strategy and Tactics in Project Implementation. Sloan Management Review, Vol 29, No. 6, 33-41.

Weiner, B. J. (2009). A theory of organizational readiness for change. Implementation Science, 67.

Wysocki, R. (2011). Effective Project Management: Traditional, Agile, Extreme (6th Edition). NJ, USA: Wiley.


Refbacks

  • There are currently no refbacks.