PROJECT MANAGEMENT PRACTICES AND PERFORMANCE OF ROAD PROJECTS IN NAIROBI CITY COUNTY IN KENYA

Laureen Kabogo Wairimu, Prof. Patrick Ngugi

Abstract


This study assessed the relationship between project management practices and performance of road projects in Nairobi City County in Kenya. More specifically, the study examined the influence of two key project management practices, namely, project cost management, and project team management on the performance of roads projects in Nairobi City County in Kenya. A descriptive research design was used in the study. A census research method was used to study all the fifty-one (target population) road projects under KeNHA and KURA over the eight years’ period between 2008 and 2013. Questionnaires were the primary data collection instruments. A pilot study, equivalent to 10% of the target population was conducted to test the reliability and validity of the data collection instruments. Data was collected from 102 project managers and project engineers from the two government institutions, KeNHA and KURA. Qualitative and quantitative data was collected. The collected data was analyzed using the Statistical Package for Social Science (SPSS V 28.0). Spreadsheets were applied to complement the SPSS software in data analysis and presentation of results. The study concludes that Project Cost Management has a positive and significant effect on the performance of roads projects in Nairobi City County in Kenya. In addition, the study concludes that Project Team Management has a positive and significant effect on the performance of roads projects in Nairobi City County in Kenya. From the findings, this study recommends that the management of roads projects in Nairobi City County should put into consideration project budgeting & allocation, cost estimation of funds and disbursement of funds in the process of Project Cost Management and consider multi-donor approach and private sector participation in funding of roads projects. In addition, PMP certification for road engineers is recommended and upscaling of attachment to engineering consultancy firms for junior engineers.

Key Words: Project management practices, Project cost management, Project team management, Performance, Roads projects 


Full Text:

PDF

References


Achuka, V. (2018, September 23). The soaring road costs: Puzzle of Sh1b per kilometre. Retrieved December 23, 2019, from Standard Media: https://www.standardmedia.co.ke/article/2001296567/puzzle-of-sh1b-a-kilometre-roads

Adan, S. I. (2017). Factors Influencing Implementation of County Road Projects in Kenya: A Case of Isiolo County. Nairobi: UoN.

Akali, T. (2018). Influence of Contractors’ Capacity on Performance of Road Construction Projects in Kakamega County, Kenya. (University of Nairobi, Research Project).

Akintoye, A., Beck, M., & Kumaraswamy, M. (2015). Public private partnerships: a global review. Routledge.

Angelstam, P., Khaulyak, O., & yamelynets, T. (2017). Green infrastructure development at European Union's green border: Effects of road infrastucture and forest habitat loss. Journal of Environmental Management, 300-311.

Anna, W., Dryl, W., Dryl, T., & Beben, R. (2019). Obstacles and challenges in applying stakeholder analysis to infrastructure projects: Is there a gap between stakeholder theory and practice? Journal of propoerty investment & finance.

Aruma, E., & Hanachor, M. E. (2017). Abraham Maslow's Hieracrchy of Needs and Assessment of Needs in Community Development. International Journal of Development and Economic Sustainability, 15-27.

Babbie, E. (2001). The Practice of Social Research. Belmont: Wadsworth.

Bacon, C. J. (2012). The use of decision criteria in selecting information systems/technology investments. MIS quarterly, 335-353.

Baniak, A., & Dubina, I. (2014). Innovation analysis and game theory: A review. Innovation: Management, Poliy & Practice, 178-191.

Bansal, P., & Song, H.-C. (2017). Similar but not the same: Differentiating corporate sustainability from corporate responsibility. Academy of Management Annals, 105-149.

Barclay, C., & Osei-Bryson, K. M. (2019). Toward a More Practical Approach to Evaluating Programs: The Multi-Objective Realization Approach. Project Management Journal, 40(4), 74–93.

Bhattacharya, A., Romani, M., & Stern, N. (2012). Infrastructure for Development: meeting the challenge. In Centre for Climate Change Economics and Policy, Londres. www. cccep. ac. uk/Publications/Policy/docs/PP-infrastructure-for-development-meeting-the-challenge. pdf. Consultado el (Vol. 15).

Bilal, K., Ali, M., Sipan, I., Ali, N., & Abas, N. (2014). Conceptual Framework of Green Infrastructure Performance Evaluation for Local Authority. International Journal of Sustainable Development & World Policy, 55-66.

Bueno, P., Vassallo, J., & K, C. (2015). Sustainability assessment of transport infrastructure projects: a review of existing tools and methods. Transport Review, 622-649.

Bundi, L. (2011). Challenges in Procurement Services within Kenya Rural Roads Authority. Nairobi: University of Nairobi.

Chandra, N. (2017). Do Project Management Competencies Influence the Project Performance: An Insight at Philips Healthcare. Wageningen University and Research Centre.

Costello, R. L. (2015). Ensuring Your Project Managers “Buy‐In” to Your Project Management System. Journal of Management in Engineering, 5(1), 23–31.

Davis, M. D. (2012). Game Theory: A Nontechnical Introduction. Courier Corporation.

Deshpande, G. (2011, October 10). Mindtree. Retrieved June 17, 2019, from Can we apply systems theory to Project Management: https://www.mindtree.com/blog/can-we-apply-systems-theory-project-management

Edinger, H., & Labuschagne, J.-P. (2019, March 22). If you want to propsper, consider building roads. China's role in Africa infrastructure and capital projects. Retrieved November 20, 2019, from Deloitte: https://www2.deloitte.com/us/en/insights/industry/public-sector/china-investment-africa-infrastructure-development.html

Emes, M., & Griffith, W. (2018). Systems thinking: How is it used in project management? London: Association for Project Management (APM).

Faridi, A., & El-sayegh, S. (2012). Significant Factors Causing Delays in UAE Construction Industry. Construction Management & Economics, 1167-1176.

Gaba, G. (2013). The impact of project delivery systems, cost minimisation and project control on construction project success. Evidence from Ghana . London: University College London.

Gällstedt, M. (20013b). Working conditions in projects: perceptions of stress and motivation among project team members and project managers. International Journal of Project Management, 21(6), 449–455.

Gbahabo, P. T., & Ajuwon, O. S. (2017). Effects of project cost overruns and schedule delays in sub-saharan Africa. European Journal of Interdisciplinary Studies, 46-59.

George, A.-M., Knight, A., & Coffey, C. (2012). 4Es and 4 Poles Model of Sustainability: Redefining Sustainability in the Built Environment. Structrual Survey, Vol. 30 Issue 5, 426-442.

Guney, T. (2017). Governance and Sustainable Development: How Effective is Governance. Jouranl of International Trade and Economic Development, 316-335.

Harrison, F. L., & Lock, D. (2014). Advanced project management: a structured approach. Gower Publishing, Ltd.

Heath, J. (2009). The Uses and Abuse of Agency Theory. Business Ethics Quarterly, Vol. 19, No. 4, 497-528.

Heldman, K., & Baca, C. (2009). Pmp-Project Management Professional Study Guide (With Cd). John Wiley & Sons.

Jabareen, Y., & Eizenberg, E. (2016). Social Sustainability: A New Conceptual Framework. MDPI.

Jain, S. (2016). Desigining and Validation of questionnaire. International dental & medical journal of advanced research.

Jugend, D., & Figueiredo, J. (2017). Integrating environmental sustainability and project portfolio management: case study in an energy firm. Sa Carlos V.24, N.3, 526-537.

Kabir, S. M. (2016). Basic Guidelines for Research: An Introductory Approach for all Disciplines. Bangladesh: Book Zone Publishers.

Kim, J. H., Seo, M., & David, P. (2015). Alleviating depression only to become problematic mobile phone users: Can face-to-face communication be the antidote? Computers in Human Behavior, 51, 440–447.

Kimemia, J. G. (2015). Determinants Of Projects Delay In The Construction Industry In Kenya; The Case Of Selected Road Projects Implemented By Kenya National Highways Authority In Kenya’s Coast Region. Nairobi: UoN.

Krane, H. P., Olsson, N. O. E., & Rolstadås, A. (2015). How Project Manager–Project Owner Interaction Can Work within and Influence Project Risk Management. Project Management Journal, 43(2), 54–67.

Kulik, B. (2005). agency theory, reasoning and culture at Enron: In search of a solution. Journal of Business Ethics, 347-360.

Laquimia, M. B., & Eweje, G. (2014). Collaborative Governance towards Sustainability: A Global Challenge on Brazil Perspective. Corporate Social Responsibility and Sustainability: Emerging Trends in Developing Economies (Critical Studies on Corporate Responsibility, Governance and Sustainability, Volume 8), 371-413.

Lugari, P. (2018, March 24). Construction of vital Thika Road footbridge finally gets underway. Retrieved March 8, 2019, from Construction Kenya: https://www.constructionkenya.com/2475/thika-road-footbridges/

Moleli, L. J. (2012). The impact of project management on road construction & maintenance at Emfuleni Local Municipality. North-West University, Mini-dissertation.

Musau, P. M. (2018). Project Management Practices and Implementation of Government Projects in Kenya, Case of Machakos County Government. (Kenyatta University, Thesis).

Njenga, B. K. (2014). Factors Influencing Effective and Efficient Delivery of Road Construction Projects in Kenya: A Case of Nairobi City County. (University of Nairobi, Research Project).

Nyabaro, K. E. (2015). Factors Influencing Implementation of Major Road Infrastructure Projects in Kenya: A case of the Sourthern Bypass Project, Kenya. University of Nairobi (Research Project).

Ofori, D. (2013). Project management practices and critical success factor -A developing county perspective. Interntiontal Journal of Business and Manageme, 14.

Omusolo, M. (2019, October 13). Contractor to finish Thika Road footbridges by end of next month. Retrieved November 14, 2019, from Standard Digital: https://www.standardmedia.co.ke/business/article/2001345335/contractor-to-finish-thika-road-footbridges-by-end-of-next-month

Rangaro, J., J.Kumari, & Raju, R. (2014). Role of Human Resource Management in Sustianble Development. International Journal on Recent and Innovation Trends in Computing and Communication; Vol 2, Issue 9, 2969-2972.

Rogers, T. M. (2019). Project Success and Project Team Individuals. European Project Management Journal, 9(1), 27–33.

Rose, K. H. (2014). Book Review: Learning for Success: How Team Learning Behaviors Can Help Project Teams to Increase the Performance of Their Projects. Project Management Journal, 42(2), 96.

Sidiropoulos, E. (2014). Education for sustainability in business education programs: a question of value. Journal of Cleaner Production, 472-487.

Syed, K. (2016). Basic Guidelines for Research: An Introductory Approach for All Disciplines. Bangladesh: Book Zone Publication.

Taherdoost, H. (2016). Sampling methods in research methodology; How to chhose a sampling technique for research. international Journal of Advanced Research in Management.

Thillian, R. A., Siddharth, R., & Mukund, S. (2010). PPPs in road renovation and maintenance: a case study of East Coast Road Project. Journal of Financial Management of Propoerty and Construction, Vol 15 Issue 1, 21-40.

Ukaga, O., Maser, C., & Reichenbach, M. (2010). Sustainable Development: Principles, Frameworks, and Case Studies. Danver: CRC Press.

Wafula, E. F. (2017). Factors Influencing Road Projects Performance in Kenya: A Case of Road Construction in Machakos County. (University of Nairobi Research Project).

Walker, A. (2015). Project management in construction. John Wiley & Sons.

Xha, L. (2014). Effects of Failure to Supervise Project Activities. International Journal of Project Management, 94-106.